top of page

Case Studies - Successful Deployments of 30KW DC ChargersIntroduction

afaxpower5

Real-world implementations demonstrate the effectiveness of 30KW DC charging solutions across various applications.


Case Study 1: Urban Shopping Center

  • Location: Munich, Germany

  • Installation: 8 x 30KW units

  • Results:

    • 18% increase in customer dwell time

    • 95% average utilization rate

    • 12-month ROI achieved



Case Study 2: Municipal Fleet Depot

  • Location: Austin, Texas

  • Installation: 12 x 30KW chargers

  • Benefits:

    • 30% reduction in fueling costs

    • Optimized overnight charging

    • Seamless integration with fleet software


Case Study 3: Highway Service Station

  • Location: Shandong, China

  • Installation: 6 x 30KW stations

  • Outcomes:

    • Average 45-minute charging sessions

    • 300% increase in convenience store sales

    • Improved traveler satisfaction

Image Description:The PREX charger (pictured) has been deployed in similar successful projects worldwide, demonstrating its reliability in diverse operating conditions. Its robust construction withstands heavy usage cycles, while the intuitive interface ensures high user satisfaction. The charger's remote diagnostics capability minimizes downtime. See real-world applications at www.afaxpower.com.

Lessons LearnedKey takeaways from deployments:

  • Proper site planning is crucial

  • User education improves utilization

  • Maintenance contracts ensure reliability

  • Data analytics optimize operations

Implementation Best PracticesRecommendations for new projects:

  • Conduct thorough site surveys

  • Engage local utilities early

  • Consider future expansion needs

  • Implement clear signage and instructions

ConclusionThese case studies prove that 30KW DC charging stations deliver tangible benefits across different scenarios, providing a reliable foundation for EV infrastructure growth.

 
 
 

Comments


bottom of page